Customization: | Available |
---|---|
Type: | Esay Open End |
Material: | Plastic |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
China suppliers non-spill 19 liter 5 gallon water bottle jar tap top cover lids 20 litre water bottle caps cap
Packing:
Inner packing: 1000pcs/PE plastic bag
Outer packing:Paper carton dimensions: 53 x 48x 48cm
Maximum loading quantity:
1*20FT': 220,000 PCS
1*40'FT: 450,000 PCS
1*40HQ': 550,000 PCS
1. Non spill style with inner stopper,55mm cap for 3 or 5 gallon water bottles in different colors available.
2. We use imported food grade 100% brand new PE material to make our caps.
3. Fits all standard 55mm neck of bottle.
4. There are non-toxic PE foam "o"ring liner inside of it.
5. Customer's design of sealing label sticker is available.
6. Weight ranges from 8.38g to 12.2g for your chooice.
7. Custom design: accept
8. Service: OEM or ODM
9. Sample: available
10. Sample cost: buyers are expected to offer the express fee
11. Sample lead time: within 5 days
12. Payment term: T/T 30% in advance, balance against before delivery
13. Production time: 15-20days
14. Delivery Port: Tianjin
No. | Item | Weight | MOQ |
Type1 | 5 Gallon Cap with Ring+ Sticker+Foam Pad |
10-11g | 220,000 pcs/ 20GP |
Type2 | 5 Gallon Cap with Double Color |
9-10g | |
Type3 | Disposable 5 Gallon Cap |
8-9g |
About us
ES AQUA LTD is engaged in professionally researches, develops and manufactures beverage-packaging machinery and dairy packaging machinery. Since its foundation, ES AQUA has concentrated on a single area of beverage and water product packaging machinery.
We mainly produce good quality beverage production lines,injection machine molds,PET preforms,caps,labels.
We got the ISO9000 quality certification several years ago. Recently, we got the ISO9000:2000 quality certification. Good quality system makes our product quality at the high level.
Location:ZhangJiagang city,Jiangsu Province
The above quotation is based on FOB terms.
Payment terms
30% as prepayment, and balance paid before shipment.
Production time:
35 days since receipt of down payment.
Installation instruction:
Video CD instruction movie and instruction book for installation and maintaining.
Engineer provides:
On clients' requirement, our engineers can be sent to your factory for the installation and commissioning, but all traveling cost including return air tickets, accommodation etc and training fee (US$100.00 per person per day) in your country should be on your account. Our machines will be delivered to you in almost assembled condition.
Warranty:
One year of guarantee from the date of delivery. If any parts have quality problem during the warranty period, we promise to send the relevant parts within 5 days to buyer by DHL or FEDEX courier.
Online technology consultations
FAQ
1.Do you supply Free samples (preform or cap)?
A: Yes, we can provide you free sample if there are in stock,but we don't include the delivery charge.
2. Can your factory provide the whole plant from A to Z?
A: Yes, we can provide a complete plant from blowing plant , water purification plant to filling & packing plant.
3. Are all machinery your factory made?
A: Yes, Our factory made the water purification plant and filling & packing plant, we do not make the bottle making machine, but we have good quality bottle making machine partner, and we can provide to customer same long warranty time and good after service.
4. How can I know the machinery quality before I order?
A: Firstly, we will invite you visiting our factory to cherk the machines quality, and show the machines running for you in our factory
5. What certification you can provide?
A: Our factory can provide the CE,ISO,ETC,which will according to some counties, we also can provide Pvoc,Coc,Soncap…and so on.
6. Can you factory make the bottle drawing, factory layout and label designs for us?
A: We can help customers design their owner bottle shape, workshop and label drawing, there jobs are free charge. (Workshop need customer to provide the size of factory )
7. Installation and Training time
A: We have professional engineer for oversea installation and training who have much experience oversea work.